Retro-Commissioning (RCx)

Reduce energy costs and optimize your existing building with retro-commissioning services from Iconergy

Your vehicle needs periodic maintenance to perform optimally—and your building is no different

Energy systems are the “heart” of every workspace. Electrical systems keep the lights on, HVAC keeps you cool in the summer and warm in the winter, etc. If these systems aren’t monitored and maintained, they’ll fail. Chances are, that’s something you want to avoid when you’re running a business. 

So, if you take your car to a mechanic, where do you go for a building tune-up? Well, you can count on us. Iconergy is Colorado’s only owned and operated energy services company, and making buildings clean, green, and efficient is our focus. 

Whether your building is a few decades or a few years old, there’s a good chance your energy systems could benefit from maintenance—and retro-commissioning allows us to do exactly that. So, if you’ve been looking to optimize your workspace, and lower your energy costs, keep reading! We’ll explain everything you need to know about retro-commissioning work with Iconergy.

What is Retro-Commissioning (RCx)?

Retro-commissioning (RCx) is the process of evaluating, optimizing, and improving the performance of existing building systems and equipment to enhance energy efficiency, occupant comfort, and functionality. 

Our primary goal with any retro-commissioning project is to identify and address operational and maintenance deficiencies, mechanical issues, and system inefficiencies that may cause energy waste, occupant discomfort, and suboptimal performance.

A retro-commissioning project typically includes periodic energy audits and energy modeling at its foundation. These services allow us to understand your past, present, and projected energy use.

From there, we can recommend cost-effective upgrades, and even simulate projected energy savings before we make any upgrades to your building’s physical infrastructure.

"Things are MUCH better since you completed retro-commissioning… In fact, most of our utility bills were cut in half and back to their original state during our first year in the building."

- Iconergy Client, K-12 Principal

Our Approach to Retro-Commissioning (RCx)

We utilize RCx holistically to analyze the entire building system, including HVAC, lighting, electrical, and other energy-consuming systems.

The beauty of RCx is its versatility. We don’t rush into retrofits and upgrades—instead, we focus on providing building data and creating a custom strategy, allowing you to make informed decisions from the get-go. Our general framework for RCx projects looks something like this:

Planning & Site Investigation

This stage involves identifying your goals, objectives, and project scope. We’ll review building documentation and original system designs, conduct interviews with building occupants, and identify potential energy-saving opportunities.

Analysis & Optimization

During this stage, we’ll perform a thorough review of your building’s systems. This includes the collection of data on energy use, occupancy patterns, temperature, humidity, and other factors that impact building performance. Following our audit, we’ll analyze the data collected during our energy audits and identify inefficiencies, operational issues, and areas for improvement. The analysis may involve energy modeling and benchmarking to identify energy-saving opportunities and quantify potential savings.

Implementation

During this stage, we’ll perform a thorough thorough review of your building’s systems. This includes the collection of data on energy use, occupancy patterns, temperature, humidity, and other factors that impact building performance. Following our audit, we’ll analyze the data collected during our energy audits and identify inefficiencies, operational issues, and areas for improvement. The analysis may involve energy modeling and benchmarking to identify energy-saving opportunities and quantify potential savings.

Measurement & Verification

After our work is done, we’ll measure and verify the performance of all retrofitted systems to ensure that they meet the expected energy savings and performance improvements.

1. Planning & Site Investigation
This stage involves identifying your goals, objectives, and project scope. We’ll review building documentation and original system designs, conduct interviews with building occupants, and identify potential energy-saving opportunities.
 
 
2. Analysis & Optimization
During this stage, we’ll perform a thorough review of your building’s systems. This includes the collection of data on energy use, occupancy patterns, temperature, humidity, and other factors that impact building performance. Following our audit, we’ll analyze the data collected during our energy audits and identify inefficiencies, operational issues, and areas for improvement.

3. Implementation
With potential energy-saving measures mapped out, our team will begin implementing solutions. Typically, this includes system upgrades, maintenance, and control optimization. Implementation may involve training building operators, technicians, and maintenance staff to ensure that the solutions are properly implemented and maintained well into the future.
 
4. Measurement & Verification
After our work is done, we’ll measure and verify the performance of all retrofitted systems to ensure that they meet the expected energy savings and performance improvements.
 
 
 

Why is Retro-Commissioning Important?

There are numerous benefits to a retro-commissioning project with Iconergy. Of course, energy savings stand out, but there’s much more to RCx! Retro-commissioning can totally reshape your workspace, increase comfort levels, and even improve productivity.

Key Benefits of Retro-Commissioning with Iconergy

In addition to the below, retro-commissioning can also provide other benefits, such as increased building value, lower maintenance costs, and improved sustainability. Our diverse approach to RCx projects means you can pick and choose energy upgrades to maximize savings on a budget-friendly basis.
Energy
Savings

Retro-commissioning can help identify inefficiencies and operational issues that result in energy waste, leading to significant energy savings. In many cases, energy savings can range from 10% to 50% of a building's total energy consumption.

Increased Indoor Environment Quality

Retro-commissioning can identify and address indoor air quality issues, such as poor ventilation, temperature, and humidity control. This often leads to improved occupant comfort, health, and productivity.

Increased Equipment Lifespan

Retro-commissioning can help identify and address equipment issues that reduce the lifespan of your equipment. By implementing the recommended maintenance practices, we aim to prolong the lifespan of your equipment, which may lead to reduced costs.

Improved Building Functionality

Retro-commissioning can identify and address issues impacting building functionality, such as lighting and control systems.

Regulatory
Compliance

Retro-commissioning can help you comply with local, state, and federal regulations related to energy consumption and indoor environmental quality.

iconergy-footer-logo-new

Cut Your Energy Costs by 10% (up to 50%) with Retro-Commissioning Services from Iconergy

Retro-commissioning is an outstanding option if you’re looking to optimize building performance, reduce energy consumption, improve indoor environmental quality, and save money. 

We recognize that there isn’t a “one size fits all” approach to energy services, and that’s what makes RCx so valuable. 

We provide energy services that work for your needs and your budget—not the other way around. By the end of your RCx project, our goal is to leave you with a building that will perform optimally for years to come. And with a number of successful RCx projects already completed, there’s no energy problem that our team can’t solve.

So, why not start working toward cleaner, greener, lower-cost energy today?

Click here to contact us for more information about a custom RCx project with Iconergy, or return to our services page to browse other solutions.

Iconergy Retro-commissioning (RCx) Case Studies

Iconergy is a dynamic team of experienced energy engineering and design-build experts. We understand that providing tailored care to our clients is just as crucial as ensuring accurate BTU calculations while delivering projects on time and on budget.
CHICAGO, ILLINOIS

Allstate Corporate Headquarters

Iconergy performed retro-commissioning for this large, multi-facility 1.2M square foot office building campus in Chicago. This site has multiple large central water-cooled chiller plants, multiple campus boiler plants, and dozens of air handling units that are a mix of dual duct and single duct VAV systems. Iconergy identified numerous ECMs with a total potential energy savings of over 1,000,000 kilowatt-hours (kWh) per year of electricity and over 100,000 therms per year of natural gas. The total energy cost savings from these ECMs are estimated at approximately $100,000 per year and have an overall project simple payback of 0.5 years.

Services: Retro-Commissioning

FORT COLLINS, COLORADO

City of Fort Collins, Mulberry Pool

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for the Mulberry Pool. The 25,000 square foot facility houses an indoor pool and spa, locker rooms, and community recreation spaces. In 2021, Iconergy completed retro-commissioning services for an HVAC and control system evaluation. The goal of this project is to investigate the design and operation of the natatorium space and provide an analysis that isolates the air from the natatorium so that it does not reach other parts of the building that are not designed for that type of air quality.

Services: Retro-Commissioning, Monitoring Based Commissioning (MBCx)

FORT COLLINS, COLORADO

New Belgium Brewery

The New Belgium Brewery is a nearly 200,000 square foot large campus dedicated to brewing beer and includes administrative offices, tasting room, brewing spaces, a bottling building, and a process water treatment facility. Iconergy performed retro-commissioning of the company’s facilities and identified numerous measures to save energy and improve operations. The overall project had less than a one year payback, providing an outstanding return on investment to New Belgium. New Belgium continues to provide ongoing commissioning and data analytics via monitoring-based commissioning using SkySpark and energy management information system (EMIS) integrations.

Services: Retro-Commissioning, Monitoring Based Commissioning (MBCx)

ARVADA, COLORADO

Jefferson County Public Schools, Arvada West High School

Retro-Commissioning services were performed to investigate the central heating and cooling plant operation as well as rooftop unit operation at the high school. Iconergy staff identified five opportunities that were calculated to reduce annual energy demand by 457,708 kWh. Iconergy also performed commissioning on this project upon its completion.

Services: Retro-Commissioning