Chicago, Illinois

Large Corporate Client

Iconergy delivered targeted retro-commissioning services for a large, complex corporate campus, identifying low-cost operational improvements that achieved immediate energy savings, improved system performance, and rapid payback while maintaining full client confidentiality.

industry

Commercial

location

Chicago, Illinois

Solutions

Retro-Commissioning

Executive Summary

Iconergy performed retro-commissioning (RCx) services for a confidential corporate client at a 1.2-million-square-foot mixed-use campus located in the Chicago metropolitan area. The campus consists of two large buildings supporting laboratories, offices, food service, and business operations. Iconergy evaluated central plants, air handling systems, and control strategies to identify and implement operational energy conservation measures (ECMs) that delivered significant electrical and natural gas savings with an exceptionally short payback period.

Scope of Services

  • Retro-commissioning planning and investigation
  • Central plant and air handling system analysis
  • BAS trend analysis and control sequence review
  • Identification and quantification of ECMs
  • Energy savings and financial analysis
  • Implementation support and verification

Project Highlights

  • Retro-commissioning of a 1.2M SF mixed-use corporate campus
  • Two-building campus with laboratory, office, food service, and industrial support spaces
  • Three central water-cooled chiller plants and three boiler plants evaluated
  • 75 air handling units including dual-duct and single-duct VAV systems
  • Five energy conservation measures (ECMs) identified and implemented
  • Over 1.0 million kWh of annual electrical savings (≈3% reduction)
  • Over 133,000 therms of annual natural gas savings (≈15% reduction)
  • Estimated annual cost savings of approximately $95,000
  • Overall simple payback of approximately 0.5 years

Energy Conservation
Measures

  • Optimization of AHU economizer enthalpy control sequences
  • Dual-duct air handling unit hot deck lockouts
  • Unoccupied-hour AHU setback and scheduling improvements
  • AHU duct static pressure setpoint resets
  • Air handling unit coil pump scheduling optimization
  • Central chilled water plant supply temperature setpoint resets

Related Projects

Row midpoint Shape Decorative svg added to bottom

Let’s Build Together

CEG Solutions helps public and private clients modernize infrastructure, achieve deep savings, and enhance energy and operational efficiency — without disrupting mission-critical operations. Let’s talk about what we can achieve together.

Or call us 703-294-5600

"*" indicates required fields

This field is for validation purposes and should be left unchanged.