Longmont, CO

St. Vrain Valley School District

Iconergy has supported St. Vrain Valley School District (SVVSD) for years through bond planning, quality assurance, and commissioning services—helping SVVSD deliver reliable, energy-efficient schools that perform as intended and remain maintainable for facilities staff.

industry

K-12

location

Longmont, CO

Solutions

Commissioning, Retro-Commissioning

Executive Summary

Iconergy staff have provided a range of services for St. Vrain Valley School District (SVVSD) including bond planning support, design and energy engineering, commissioning (Cx), and retro-commissioning (RCx). SVVSD contracted Iconergy to help shape bond initiatives and guide retrofit and new construction projects to improve operational performance, occupant comfort, and energy efficiency. Representative projects include commissioning of a major mechanical and controls retrofit at Sanborn Elementary School as well as commissioning and retro-commissioning services for the addition and renovation at Silver Creek High School.

Representative SVVSD Projects

  • Sanborn Elementary School – Longmont, CO
  • Sanborn Elementary School is a 49,000 SF elementary school that underwent a complete mechanical and controls retrofit during summer 2014. Iconergy commissioned all new mechanical systems and verified proper operation of the new BAS. Systems included rooftop units (RTUs), VAVs, boiler plant, chiller plant, and baseboard radiators.
  • Silver Creek High School – Thornton, CO

Iconergy commissioned a laboratory addition and renovation project and performed a baseline HVAC review. Commissioned systems included BAS, TAB validation, gas/DX rooftop units, single-zone rooftop units, VAV terminal boxes, exhaust fans, fan coil units, reheat coils, unit heaters, and automated lighting controls. Iconergy also performed retro-commissioning for existing constant-volume RTUs, kitchen makeup air unit, reheat coils, and the hot water plant.

Scope of Services

  • Bond planning support and quality assurance for capital projects
  • Commissioning (Cx) for new construction, additions, and major renovations
  • Retro-commissioning (RCx) and baseline HVAC reviews for existing systems
  • Building automation system (BAS) verification, integration, and sequence review
  • Testing, Adjusting, and Balancing (TAB) validation and functional performance testing
  • Issue tracking, closeout documentation, and staff coordination

Project Highlights

  • Long-term partner supporting SVVSD bond planning, design engineering, energy engineering, commissioning, and retro-commissioning.
  • Commissioning and controls verification for a districtwide mechanical and BAS retrofit program.
  • Sanborn Elementary School: 49,000 SF complete mechanical and controls retrofit with full commissioning and BAS verification (2014).
  • Silver Creek High School: commissioning for laboratory addition and renovation plus baseline HVAC review and RCx of existing systems.

Commissioned systems:

RTUs, VAVs, boiler and chiller plants, baseboard radiators, exhaust fans, fan coils, and automated lighting controls.

Commissioning scopes:

TAB validation, functional performance testing, and integration/sequence verification through the BAS.

Related Projects

Row midpoint Shape Decorative svg added to bottom

Let’s Build Together

CEG Solutions helps public and private clients modernize infrastructure, achieve deep savings, and enhance energy and operational efficiency — without disrupting mission-critical operations. Let’s talk about what we can achieve together.

Or call us 703-294-5600

"*" indicates required fields

This field is for validation purposes and should be left unchanged.