Iconergy provided multiple design-build infrastructure and renewable energy improvement projects for the Colorado Department of Human Services (CDHS) across several Youth Services Center campuses. These projects addressed critical site infrastructure challenges, supported renewable energy goals, and delivered turnkey solutions including engineering, procurement, construction, commissioning, and warranty support. Collectively, the projects enhanced campus resiliency, reduced operational risk, and advanced the State’s sustainability and energy objectives.

Mount View Youth Services Center – Water Drainage Infrastructure

The Harriman Ditch runs through the Mount View Youth Services Center (MVYSC) campus in Lakewood, Colorado, providing non-potable irrigation water. As a ditch share owner, CDHS is responsible for maintaining the ditch within campus boundaries. To prevent ongoing water damage to facility infrastructure, Iconergy was contracted to enclose and bury approximately 700 linear feet of the ditch within a pipe system, protecting buildings and site utilities while maintaining irrigation functionality.

Platte Valley & Prairie Vista Youth Services Centers – Solar Photovoltaic Systems

Iconergy was selected by CDHS to design, manage, and construct ground-mounted solar photovoltaic systems at two Youth Services Center campuses. At the Platte Valley Youth Services Center in Greeley, Iconergy delivered a 35 kW net-metered PV system completed in July 2021. At the Prairie Vista Youth Services Center in Brighton, Iconergy delivered a 45 kW net-metered PV system. Both projects were provided as turnkey design-build solutions, including engineering, procurement, construction, commissioning, and warranty-phase support.

Scope of Services

  • Design-build project delivery
  • Civil infrastructure protection and drainage solutions
  • Solar photovoltaic system engineering and design
  • Procurement and construction management
  • System commissioning and performance verification
  • Utility coordination and net-metering support
  • Warranty-phase assistance

Project Highlights

  • Multiple design-build projects delivered for secure Youth Services Center campuses
  • Infrastructure protection project to prevent water damage at Mount View Youth Services Center
  • Turnkey solar photovoltaic installations at Platte Valley and Adams Youth Services Centers
  • Ground-mounted, net-metered PV systems totaling 80 kW installed
  • Single point of responsibility for engineering, construction, and commissioning
  • Projects completed between 2020 and 2021
  • Improved facility resilience, sustainability, and long-term operational performance

Key Project Metrics

  • Mount View Youth Services Center: ~700 LF of irrigation ditch enclosed
  • Platte Valley Youth Services Center: 35 kW ground-mounted PV system
  • Prairie Vista Youth Services Center: 45 kW ground-mounted PV system
  • Total solar capacity installed: 80 kW
  • Combined solar project budget: approximately $270,000

Related Projects

Local & State Government

Clear Creek County

Row midpoint Shape Decorative svg added to bottom

Let’s Build Together

CEG Solutions helps public and private clients modernize infrastructure, achieve deep savings, and enhance energy and operational efficiency — without disrupting mission-critical operations. Let’s talk about what we can achieve together.

Or call us 703-294-5600

"*" indicates required fields

This field is for validation purposes and should be left unchanged.