Fort Knox, Kentucky

U.S. Army Fort Knox, Airfield

Iconergy revitalized Godman Army Airfield at Fort Knox through an ESPC phase, replacing outdated systems with resilient electrical infrastructure and modern LED lighting to make it the Army’s first airfield with 100% LED runways and taxiways.

industry

Federal Government

location

Fort Knox, Kentucky

Solutions

Energy & Operational Efficiency, Performance Assurance, Performance Contracting, Resiliency

Annual Savings

$56K

Overview

In 2019, a failure of Godman Army Airfield’s lighting system created urgent safety and operational risks. Building on prior work at Fort Knox, the Army Corps of Engineers engaged Iconergy to restore and modernize the airfield. The scope covered two runways, three ramps, multiple parking areas, and five taxiways. The mission: deliver resilient, code-compliant infrastructure while cutting energy and O&M costs.

Solutions

Our team deployed a comprehensive set of electrical and lighting upgrades: ~180,000 linear feet of new airfield cable, ~4,000 feet of conduit, LED retrofits across all runways, taxiways, and helipads, new Constant Current Regulators, and a modern Airfield Lighting Control & Monitoring System. The project also separated the 2400VAC system from the lighting circuits for improved reliability and installed new threshold light bars. Together, these measures restored safety, streamlined maintenance, and ensured FAA-compliant performance.

Results

The project delivered $56K in verified annual savings while providing Fort Knox with safer, more reliable airfield operations. It eliminated frequent ground faults, replaced obsolete equipment, and reduced maintenance complexity. With 100% LED runways and taxiways, the project set a new Army benchmark for resilient, efficient airfield design. Over 50,000 pounds of scrap metal were recycled as part of construction, furthering sustainability goals.

Project Highlights

  • First & only Army airport with 100% LED runways & taxiways
  • $56K annual savings
  • Expedited project development (completed in less than 4 months)
  • 50,000+ pounds of scrap metal recycled

Energy Conservation
Measures

  • Full LED lighting retrofits (runways, taxiways, helipads, parking areas)
  • Replacement of ~180,000 ft of airfield cable & ~4,000 ft conduit
  • Replacement of Constant Current Regulators
  • New Airfield Lighting Control & Monitoring System
  • Separation of 2400VAC system from airfield lighting
  • Demolition & repair of threshold light bars (30 total lights)

Awards

Related Projects

Deep Energy Retrofit Project
Federal Government

Webster Outlying Field

Row midpoint Shape Decorative svg added to bottom

Let’s Build Together

CEG Solutions helps public and private clients modernize infrastructure, achieve deep savings, and enhance energy and operational efficiency — without disrupting mission-critical operations. Let’s talk about what we can achieve together.

Or call us 703-294-5600

"*" indicates required fields

This field is for validation purposes and should be left unchanged.