Stratton, Colorado

Stratton School District R-4

Iconergy partnered with Stratton School District R-4 to deliver a turnkey, grant-funded design-build retrofit—modernizing aging HVAC, controls, and electrical infrastructure to create a safer, healthier, and more reliable learning environment for a rural K–12 community.

industry

K-12

location

Stratton, Colorado

Solutions

Design-Build Retrofitting

Executive Summary

Iconergy was selected by Stratton School District R-4 to provide facility infrastructure master planning, BEST grant assistance, and a turnkey design-build efficiency retrofit to upgrade critical building systems. Prior to the project, many packaged rooftop HVAC units were 20+ years old—beyond their expected service life—and control system limitations contributed to comfort challenges and an inadequate learning environment. Iconergy led the Colorado BEST grant application process and secured funding to complete HVAC, controls, electrical, and related health and safety improvements. Iconergy also helped the District leverage CARES Act funds to replace a portion of rooftop units over a holiday break, with remaining work completed through summer and fall. A follow-up project included replacement and commissioning of security systems.

Scope of Services

Facility infrastructure master planning and prioritization
Colorado BEST grant application development and support
Turnkey design-build services (engineering, procurement, construction)
Health & safety upgrades implementation
Commissioning of newly installed equipment and systems

Key Upgrades Implemented

  • HVAC equipment replacement and upgrades (packaged rooftop units)
  • Controls improvements and building automation system (BAS) upgrades
  • Electrical system improvements
  • Mechanical system improvements
  • Reverse osmosis (RO) system improvements

Project Highlights

  • Turnkey design-build efficiency retrofit for a rural K–12 school district facility.
  • BEST grant application leadership resulting in successful grant award to fund critical infrastructure upgrades.
  • 80,000 SF of facilities modernized with improved comfort, reliability, and safety (project completed 2021).
  • Construction budget: $1,033,000.
  • HVAC and controls modernization addressing end-of-life rooftop units and BAS performance issues.
  • Electrical infrastructure upgrades resolving safety risks and power quality concerns.
  • Use of CARES Act funds to accelerate rooftop unit replacements during holiday break 2020.
  • Project upgrades included HVAC & controls, mechanical improvements, BAS upgrades, electrical systems, and reverse osmosis (RO) system.
  • Follow-up engagement to replace and commission campus security systems.

Related Projects

Row midpoint Shape Decorative svg added to bottom

Let’s Build Together

CEG Solutions helps public and private clients modernize infrastructure, achieve deep savings, and enhance energy and operational efficiency — without disrupting mission-critical operations. Let’s talk about what we can achieve together.

Or call us 703-294-5600

"*" indicates required fields

This field is for validation purposes and should be left unchanged.