City of Fort Collins, Mulberry Pool

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for the Mulberry Pool. The 25,000 square foot facility houses an indoor pool and spa, locker rooms, and community recreation spaces. In 2021, Iconergy completed retro-commissioning services for an HVAC and control system evaluation. The goal of this project is to investigate the design and operation of the natatorium space and provide an analysis that isolates the air from the natatorium so that it does not reach other parts of the building that are not designed for that type of air quality.

Back to Case Studies